Delivered in 18 days through turnkey EPC execution, transforming a bare shell into a fully operational fintech workspace.

From Bare Shell to Fully Functional Workspace

End-to-end turnkey delivery of an agile, high-density Grade-A corporate workspace across 1,20,000 sq.ft for a leading global financial technology enterprise on Chennai’s prime OMR IT Expressway.

OMR IT Expressway

Chennai, Tamil Nadu, India

1,20,000 sq.ft

Triple Interconnected Levels

12 Months

Handed over 18 Days Early

Day-1 Active

Zero-Snag Statutory Signoff

Completed Infrastructure Showcase

Project Summary Specifications

Turnkey Design-Build Governance Record

OMR IT Expressway

Chennai, Tamil Nadu, India

Cyber Corridor Prime Grade-A Asset

1,20,000 sq.ft

3 Interconnected Floorplates (L3, L4, L5)

High-Density Agile Engineering Layout

12 Months Contracted

Handed over 18 Days Ahead of Schedule

Cyber Corridor Prime Grade-A Asset

Full Turnkey EPC Delivery

Civil, Interior Architecture, MEP & IT-Security Infrastructure
Single-Contract Turnkey Governance

Tier-1 Fintech Tech Center

Tier-3 Server Rooms & Mission-Critical Trading Desks

High-Density Agile Engineering Layout

LEED Gold Certified

ISO 9001:2015 & ISO 45001 Compliant Execution

100% First-Pass Municipal NOC Clearances

01. The Challenge: High-Stakes Timeline & Shell Deficiencies

Urgent 850-engineer capability hub rollout in Chennai faced acute commercial and physical risks.

Tight Timeline & Lease Liabilities

12 Mo. SLA • Handed over 18 Days Early
Strict go-live schedule tied to client trading rollouts. Any delay risked ₹2+ Crore monthly liquidated damages in recurring lease overlaps.

TIMELINE EXPOSURE Strict Commercial Cut-off

Severe Shell Deficiencies

38mm Slab Variance • Zero Acoustic Dampening
Unconditioned bare concrete with major slab deflections, severe riser clashes, and raw reverberation demanding NC-35 acoustic isolation.

TECHNICAL HURDLE  Precision Leveling & Retrofit

Multi-Vendor Fragmentation

14 Sub-trades Unified • Zero Critical Bottlenecks

Managing 14 independent sub-contractors without centralized digital coordination risked site rework, trade friction, and budget creep.

GOVERNANCE BARRIER  Single Unified Authority

02. The Solution Strategy: Single-Point Turnkey
EPC

Collapsing multiple vendor layers into an integrated design-build workflow under unified delivery governance.

Single-Contract
Accountability

12 Mo. SLA • Handed over 18 Days Early
Single contract coordinating civil, MEP, joinery, and data infrastructure. Eliminates trade finger- pointing with weekly single-source milestone tracking.
STRATEGIC VALUE

Day-01 Terrestrial 3D
Laser BIM

Zero-Clash 3D Scan • 100% Pre-installation Verification
Point-cloud spatial clash detection mapped riser & duct collisions prior to installation, maintaining strict zero-variance BOQ parameters.
STRATEGIC VALUE

Concurrent Engineering & Modular Pre-fab

Parallel Sprints • Compressed Schedule by 7 Weeks
Off-site CNC joinery and acoustic panel fabrication executed simultaneously with on- site civil works, shortening on-site erection time dramatically.
STRATEGIC VALUE

Execution Timeline: 4-Stage Turnkey Process

Connected linear milestones compressing 14 months of complex construction into a seamless 12-month delivery.

Phase 1: Planning & BIM Audit

Terrestrial 3D laser mapping, civil defect scans, MEP clash avoidance, and firm zero-variance BOQ signoff.
MILESTONE OUTPUT
Clash-free digital twin

Phase 2: Civil & Structural Fit-Out

38mm screed slab rectification, 75mm GI acoustic stud walls, and heavy-duty raised access flooring.
MILESTONE OUTPUT
True-level base & NC-35 walls

Phase 3: Synchronous MEP & Tech

Commissioning Daikin VRV-IV chillers, Form-2B switchboards, and Tier-1 CommScope Cat6A network backbones.
MILESTONE OUTPUT
Tier-3 servers & clean power

Phase 4: Snag-Free Handover

180-point QA/QC protocol signoff, first-pass Fire NOC, LEED Gold audit, and keys handed over 18 days early.

MILESTONE OUTPUT
100% Day-1 active workspace

The Workspace Metamorphosis

Documenting identical camera coordinates across structural milestones.

Dilapidated Bare Shell

Raw concrete slabs, no utility infrastructure, 38mm uneven floor screed, and exposed deck.

Synchronous Fit-Out

Laser-guided ducting, high-density cable trays, drywall framing, and precision MEP routing.

Ready-to-Occupy Grade-A HQ

Fully commissioned biophilic workspace supporting 850 engineers with certified acoustics.
ENGINEERING FEASIBILITY CONSULTATION

Facing Similar Complex Site or Timeline Constraints?

Let’s discuss your project parameters with our Principal Engineers before committing capital.

Comprehensive Scope of Work Executed

Every technical discipline delivered directly by Telemerge’s specialized in-house business units.
Lenskart store exterior

Civil & Partition Works

Floor screed rectification, 75mm GI acoustic stud gypsum walls, suspended acoustical tile grid, and heavy-duty antistatic access flooring.

EXPLORE CIVIL WORKS SCOPE →
Civil interior works
Retail interior
Shopping mall interior

Carpentry, Acoustics & Signage

850 motorized sit-stand workstations, custom thermoformed Corian reception hub, NRC 0.85 fluted timber acoustic wall cladding, and 3D illuminated branding.

EXPLORE INTERIOR FIT-OUT SCOPE →
Clothing store
Retail display shelves

Electrical & ELV Systems

Schneider Form-2B type-tested LT distribution boards, dual-redundant UPS routing, Tier-1 Cat6A structured cabling, and smart automated lighting controls.

EXPLORE ELECTRICAL SOLUTIONS →
Interior display
Office furniture and reception

HVAC & Climate Control

High-efficiency Daikin VRV-IV heat recovery plants, precision air balancing, MERV-13 dual-stage filtration, and acoustically insulated supply ducting.

EXPLORE HVAC SYSTEMS →

Hard Engineering ROI & Measurable Proof

Quantified delivery metrics achieved through consolidated single-source EPC execution.
0 Days

Early Handover

Saved client approximately ₹2.4 Crore in holding lease liabilities and enabled early trading operations.

0 %

First-Pass Compliance

Achieved municipal Fire NOC, structural stability validation, and complete LEED Gold green building compliance.
+ 0 %

Usable Space Optimization

Radial layout accommodated 15- 20% higher operational density without compromising collaborative circulation.
0 %

BOQ Price Variance

Guaranteed firm-fixed price contract execution with zero change-order escalations or unforeseen budget creep.

Ready to Lock Your Project Budget & Timeline?

“Telemerge transformed an unconditioned, severely deficient 1,20,000 sq.ft bare shell into our premier global fintech engineering hub 18 days ahead of our critical deadline. Their unified turnkey EPC governance saved us millions in lease holding costs and delivered zero-snag Day-1 readiness.”

Senior Vice President – Global Real Estate & Infrastructure Operations

Tier-1 Global Financial Technology Group (Fortune 500)

TRUST & GOVERNANCE SEALS

ISO 9001:2015 & 45001

Quality & OHSAS Certified Operations

LEED Gold Verified

Sustainable Low-Carbon Materials

100% In-House Delivery

Direct Civil, MEP & Technology EPC

VISUAL PROOF & DETAIL

Project Visual Gallery

ACCELERATE YOUR INFRASTRUCTURE

Ready to Transform Your Workspace?

Partner with Telemerge for single-source turnkey interior engineering from bare-shell to Day-1 operations. Book a complimentary 3D site audit with our principal infrastructure architects today.
✓ 100% In-House Delivery
✓ Zero Cost Escalation Pledge
✓ 12-Month Defect Liability SLA